West Palm Beach VA Medical Center
Working with Pointer Construction Group, Best-Tec completed demolition and concrete cutting at the West Palm Beach VA Medical Center. The medical center was updating their laundry facility, so a ventilation system had to be installed. On the rooftop, Best-Tec provided concrete core cutting and square vent cuts. In addition, we completed the demolition on a wing of the center. This consisted of drywall and metal stud framing removal. Since the building had to remain operational during the project, extra considerations and thoughtful planning was critical to ensure safety of staff and patients.